Vali Asr Shahin Shahr Wastewater Project Pipe Laying of the Wastewater Transmission Line from the 1000 Cubic Meter Reservoir to the 10,000 Cubic Meter Vali Asr Reservoir  

Amount of work

Work Volume: 8600 meters long

Project Details

Installation of fittings, valves, and a valve chamber Construction of the Vali Asr Pumping Station building Pipe material: GRP pipes Pipe diameters: 600-800 mm

Project steps

Construction operations and GRP pipe laying

Contract time

execution year : 1394
Execution time : 6 Month
Contract start date : 1394/09/01

Terms of the Contract

City : Isfahan
Contract Address : Isfahan, Shahinshahr

Field of Expertise

Price list : Building, electrical and mechanical transmission line in 2016
Field of Expertise : Water, buildings, facilities

Image Gallery

GALLERY GALLERY GALLERY GALLERY